13. A firm foundation . . .
On March 4 they started setting foundation form boards for the GarageDominium. Plumbers started installing the drainpipes for the sinks, baths, and toilets which will all be under the foundation…
On March 4 they started setting foundation form boards for the GarageDominium. Plumbers started installing the drainpipes for the sinks, baths, and toilets which will all be under the foundation…
The contractor discovered that there is only about 12 to 18 inches of soil then it is solid rock under the entire GarageDominium building site. An excavator with a hydraulic…
On February 8, site work began! After years of wandering the Texas hill country trying to decide on a place, after another 2 years and 7 months of planning and…
Workshop Appliances (Tools!) Back to the garage again. I plan to install an air compressor with permanent piping. There is a compressor closet in the workshop. I’ll run air lines…
We want the GarageDominium to be energy efficient, but any upgrades need to have a good payout. There are a lot of design and equipment options to make very efficient…
Back to the main feature of the GarageDominium, the garage. I’ve spent a lot of time on laying out the garage and shop to make sure everything would work and…
Actually, the shed, the shop, and the garage are “he” stuff with the rest of the house being U.W.’s domain. We decided that we should add a small utility shed…
This might be a good time to mention that it takes a lot of effort to keep stuff organized for a GarageDominium or house build project. We have scribbled notes,…